Tren-Tech provides engineering design and analysis for pipe jacking and auger boring construction. We support contractors planning trenchless installations with analysis of steel casing, thrust forces and related structural components.

Engineering for trenchless installation

Our services include thrust blocking, cribbing, jacking frames, liner plates and other components associated with the installation. We review the proposed construction approach and available project information to establish the required engineering scope.

Related project experience

For SARA Project no. 0660, Tren-Tech provided sheet pile design, casing design, circular shaft design, thrustblock design and pipe jacking calculations for anticipated frictional forces.

Request a pipe jacking design quote

Send your project location, alignment and profile drawings, casing information, available soil information, proposed equipment and pit layout. Identify any owner requirements and the planned construction schedule.

Can the pit and jacking support be reviewed together?

Include both in your inquiry. Tren-Tech can review the proposed installation and confirm which pit, shoring and jacking components are included in the engineering scope. Explore our temporary shoring design service for related excavation support.

Request a project quote or call 972-304-2171. Explore all Tren-Tech engineering services.